Construction of Sheds (3 or 4) for Camp Sites
Work on Staff Site Shed
Work on Radio closet
Set up tents and cots in unused sites, Clear Fallen Limbs from Sites, Check Platform Support
Set up Staff site tents and cots
Repair roofs on the Health Lodge and Trading Post and structural support on back porch roof of TP
Repair and Paint Benches in Chapel
Shotgun Pavilion Construction
Repair roof on Pump House
Upgrade electric in Pump House
Spread stone around OFC Pavilion and
Waterfront Pavilion
Repair Fiber ends in all Buildings
Begin repairs on COPE latrine (Carpentry and Plumbing)
May 1, 2010 - Akelaland
Repairs on BB Gun Range Roof
Picnic Table Construction
Tree Removal
Set-up Tents
Repairs to the Minsi Golf Course
May 8, 2010 - Camp Minsi
Set-up Tents
Spread sand at the waterfront
Brush clearing
Repair Shooting Sports Perimeter
Begin Construction of Shotgun Pavilion
Roof Replacement - Remove rolled roofing and Install plywood where needed.
Auto Repair - Adjust linkage on GMC pickup